Step 1 - Get a connection with Unfuddle 


1. In Worksnaps, go to Profile & Settings >> 3rd-Party Integration >> Unfuddle, Switch Unfuddle Integration to Yes (Figure 1), input Unfuddle URL, Unfuddle Login and Unfuddle Password value in corresponding input field.


  Figure 1 


2. Then click the button Test Connection and pop up Test Connection window (Figure 2), and click Start Test button, Show The connection succeeded (Figure 3). and you can Click Save Configuration button to save connection information

  Figure 2


  Figure 3



Step 2 - Sync Projects and Tasks from Unfuddle


Once you have established connection with Unfuddle, you can click the link to sync projects and tasks with Unfuddle (Figure 4).

 

    Figure 4


A wizard will guide you through the process to import projects and tasks from Unfuddle (Figure 5,6,7,8, and 9).

 


 Figure 5


 Figure 6

 Figure 7 



 Figure 8


You also need turn on the time sync to Unfuddle, click click here link under Advanced Actions section (Figure 9)

    Figure 9

And then pop up Set up time sync with Unfuddle window (Figure 10), select value yes in Turn on time sync with Unfuddle drop-down list

Click Confirm button, You can establish the synchronization of logged time with Unfuddle as Hint information under confirm button.

Once a project is imported and the logged time is synchronized, you should be able to see it on Manage >> Manage Projects page and you will be able to log time to the project.